Power is usually your biggest operating cost. Foreman's power controls let you decide when your miners run, from a one-time power-down to fully automated curtailment based on energy prices or signals from your power provider. This module walks through your power settings first, then the Power section where you run and review power events.

What You'll Accomplish

By the end of this module, you will have:

  1. Configured your power settings: curtailment opt-in, ramp intervals, strike prices, and notifications
  2. Run your first power event from the Command Center
  3. Created reusable Saved Controls for the power changes you make often
  4. Reviewed and reverted events in Event History

Note: Dispatches, automation, and Commitments are premium features, and Commitments are available only with some power partners and programs. If you'd like to add them, contact the Customer Success team.

Before You Start

  • Set your power pricing. In Settings > Company Settings, choose Fixed (enter your cost per kWh) or Variable (choose your ISO zone and adder per MWh), and set your Power Cost Currency. You did this in Learning Path 1, Module 1. Strike prices only work if your power cost currency matches your ISO zone's currency.
  • Check that your miners support power commands. The Available Miners tile on the Power page shows how much of your fleet is ready for power control.

Part 1: Configure Your Power Settings

Open Settings from the user menu in the top-right corner and go to the Power Control section. You can also click Settings from the top of the Power page.

Onboarding: Power Control settings

Curtailment Opt-In

This global setting decides whether Foreman may curtail your site automatically. That includes signals from a third-party provider, such as a utility or demand response partner, and strike price triggers.

  • Turn it on if you're in a demand response or curtailment program that sends signals through Foreman, or if you're using strike prices.
  • Leave it off if you're not in one of these programs. Turning it on marks your site as available to your provider. With it off, Foreman never curtails automatically, and your site stays under manual control.

Curtailment Retry and Retry Duration

Curtailment Retry re-sends the most recent power-down or power-up every five minutes, so miners that missed the first command still get it. We recommend turning it on if you use opt-in or strike prices.

Retry Duration limits how long retries continue, with separate values for during and after a dispatch. A blank value means Foreman retries indefinitely. A common setup:

  • During: blank, so miners stay down for the whole event
  • After: 10–20 minutes, so you regain manual control shortly after the event ends

Onboarding: Retry Duration

Selection Method

Decides which miners are curtailed first:

Ramp Intervals

Ramp intervals spread power changes over time instead of switching everything at once, which protects your infrastructure and avoids sudden swings in load.

  • Ramp Down Interval (up to 15 minutes): applies to manual power controls and strikes, but not to dispatches
  • Ramp Up Interval: applies to all power controls, including dispatches

Example: with a 10-minute ramp up, 100 miners come back online gradually over 10 minutes.

Auto-Strike

Auto-Strike curtails miners when power costs more than they earn. For each miner type, Foreman calculates a strike price from the last five days of performance data and updates it every five minutes. Less efficient models curtail first, and more efficient models keep running.

  • After turning it on, click Calculated Auto-Strike per Miner Type to see each model's current strike price.
  • Tolerance adds a price buffer (per MWh) above the strike price that triggers a stronger "high" curtailment.
  • High/Low Curtail After and Resume After set how many 5-minute intervals prices must stay above or below the threshold before Foreman acts. This prevents on/off cycling during short price spikes.

Onboarding: Calculated Auto-Strike per Miner Type

Note: Turning on Auto-Strike disables Manual Strike. Dispatches always override strike settings.

Manual Strike

Use Manual Strike to set your own price thresholds. It's available only when Auto-Strike is off.

  1. Click Add Strike Price.
  2. Choose miner types (type at least 3 characters to search), or leave this blank to apply to all miners.
  3. Enter the strike price in your power cost currency.
  4. Set Curtail After and Resume After in 5-minute intervals.
  5. Click Save, and repeat for each threshold you need.

Onboarding: Manual Strike

Manual Strike with Power Mode Support (beta) lets each strike price switch miners to High, Low, or Sleep mode instead of only on and off. Check that your miner models support the power mode you choose.

Notification Settings

Choose which power events you want to be notified about, then enter the email addresses that should receive those notifications. Include whoever is responsible for your site when power changes, especially if you use opt-in or strike prices.

For every option in detail, see Quick Guide: Power Control Automation Settings.

Part 2: Use the Power Section

Go to Power in the left-hand menu. The tiles at the top show:

  • Available Miners: the share of your fleet that's healthy, reporting, online in Pickaxe, and supports power commands
  • Power Draw: estimated miner load next to metered site load
  • Power Cost: an estimated 24-hour cost based on miner wattage and your power price

Onboarding: Power page tiles

Command Center

The Command Center is where you create and track power events.

Onboarding: Command Center

Add a Power Up or Power Down event:

  1. Click Add Event and choose Power Up or Power Down.
  2. Enter a Name and, optionally, a Reason.
  3. Miner Target: All Miners, A Subset of Miners, or A Subset of Miners Excluding. For a subset, choose how to group miners (for example, by Pickaxe or miner type), then the groups.
  4. Power Target: All Targeted Miners, Reduce By, or Reduce To a set amount of power. Then set the ramp time in minutes or hours.
  5. Schedule: Run Now, Run Later (pick a date and time), or Recurring (pick days, time, and timezone).
  6. Click Save.

Onboarding: Add Event

Events appear in the table as In Progress or Scheduled. You can view, edit, or delete Scheduled events before they start. In-progress events can only be viewed.

Recurring events can be paused and resumed without losing their settings. Paused events are clearly marked, you can view them all in one place, and every pause and resume is recorded in the audit log.

Dispatches (premium) curtail your site for a set window to cut costs, take part in energy markets, or meet curtailment obligations. Choose Dispatch under Add Event, set a Full Site or Setpoint power target, choose system or custom ramp intervals, and set a start time (an end time is optional). See Quick Guide: Dispatches.

Commitments (select programs) track power agreements with your power partner. See Quick Guide: Commitments.

Saved Controls

Saved Controls are power changes you set up once and run whenever you need them, such as "Power down Building B" or "Reduce to 5 MW." They're ideal for routine maintenance and emergency curtailment.

  1. Go to Power > Saved Controls and click Add Saved Control.
  2. Enter a Name and choose the Direction (Up or Down).
  3. Set the Miner Target and Power Target as you would for an event.
  4. Set the Ramp Target in minutes or hours.
  5. Click Save.

Onboarding: Add Saved Control

From the Saved Controls table you can run, edit, or delete a control, and filter or sort to find one quickly.

Tip: Create a matching pair for each area you curtail often, for example "Building B – Down" and "Building B – Up," so anyone on your team can respond the same way.

Event History

Click View Event History to see every power event that has run, including power downs, power ups, and dispatches.

Onboarding: Event History

  • Filter and sort by type, date, status, and more.
  • Export the table for reporting or audits.
  • For a power down or power up, open the ellipses menu and choose View Details or Revert to undo it.
  • For a dispatch, choose View Related Events to see the power changes it made.

Best Practices

  • Start manual, then automate. Run a few events by hand and check Event History before turning on opt-in or strike prices.
  • Always use ramp intervals on large fleets to protect your electrical infrastructure and stay within your provider's limits.
  • Set retry durations rather than leaving both blank, so you can take back manual control after an event.
  • Know how power controls interact with triggers. During an active dispatch, trigger actions that send commands to miners are skipped, and Pickaxe power triggers are paused. Strikes don't block manual power controls.
  • Review Event History monthly to confirm events ran as expected.

Common Issues

Strike prices aren't curtailing:

  • Check that Curtailment Opt-In is on.
  • Check that your Power Cost Currency matches your ISO zone's currency.
  • Check your Curtail After setting. Prices must stay above the strike for that many 5-minute intervals.

Some miners didn't power down:

  • Check the Available Miners tile. Unhealthy miners, miners that aren't reporting, and models that don't support power commands can't be controlled.
  • Turn on Curtailment Retry so missed miners are retried.

Miners keep powering back down after an event:

  • Set a Retry Duration After value so retries stop shortly after the event ends.

Setup Checklist

☐ Confirm power pricing and currency in Company Settings

☐ Decide whether to turn on Curtailment Opt-In

☐ Turn on Curtailment Retry and set retry durations

☐ Choose a Selection Method

☐ Set Ramp Down and Ramp Up intervals

☐ Configure Auto-Strike or Manual Strike prices (if you use them)

☐ Add notification emails

☐ Run a test Power Down and Power Up on a small subset

☐ Create Saved Controls for routine curtailments

☐ Review the results in Event History

For a full reference of the Power section, see Quick Guide: Power.

What's Next?

You've completed Learning Path 3. Your site now runs on your power strategy, whether that's manual, scheduled, or fully automated.

Next: Learning Path 4: Introduction to Assets & Inventory – Track your hardware and spare parts from purchase to retirement.

Was this article helpful?

0 out of 1 found this helpful

Have more questions? Submit a request

Can't find what you're looking for?

Our support team can help with setup, hardware and billing questions.

Contact Support