Updated

Four Coincident Peak (4CP) programs charge transmission costs based on your load during ERCOT's four monthly summer peaks. Foreman can curtail automatically when your energy partner sends a 4CP dispatch. This article shows how to set that up and check your configuration.

Before You Start

  • An agreement with a partner that sends 4CP dispatches (such as Priority Power or GridBeyond).
  • Partner Integrations on your plan. If you see an upgrade banner in the Integrations section, contact Customer Success.
  • For Priority Power: an RTAC installed at the site.

Step 1: Turn On Curtailment Opt-in

Go to Settings > Power Control and turn on Curtailment Opt-in. This lets Foreman curtail automatically. While it's off, dispatches are disabled.

Step 2: Set Up the Integration

Integrations let Foreman receive signals from your energy partner, such as price events, grid stress alerts and demand response calls, and curtail your fleet automatically. Contact Customer Success to set one up so it's configured correctly for your site.

Supported partners include Priority Power, Voltus, CPower PLC, CPower Web, CSD Energy, Scioto, NuEnergen Web, NuEnergen PLC, Duke Energy, Enersponse, Diamond Energy and GridBeyond.

Step 3: Turn On the 4CP Opt-in

Once the integration is set up, turn on the matching toggle in the Integrations section of Settings > Power Control, then click Save:

Toggle What it does
Priority Power 4CP Opt-in Curtails automatically when Priority Power sends a 4CP dispatch through an installed RTAC.
GridBeyond 4CP Opt-in Curtails automatically when GridBeyond sends a 4CP dispatch.
Screenshot 2025-05-12 at 2.06.22 PM.png

With the integration active and the opt-in saved, your site responds to 4CP dispatches automatically. Review past events in Power > Event History.

Related Articles

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request

Can't find what you're looking for?

Our support team can help with setup, hardware and billing questions.

Contact Support