Connecting a Modbus meter or other Modbus device lets Foreman read real values from your electrical system instead of estimating them. Depending on how you set it up, a Modbus device can feed:
- Metered Site Load on the Command Center, used by Setpoint dispatches.
- Available Power, used by Buffered dispatches.
- Custom readings, such as gas pressure, used by Infrastructure Initiated Dispatches and infrastructure triggers.
If your device type isn't listed when you add it, contact support so we can look at supporting it.
Before You Start
- You need the Edit Infrastructure permission.
- The device must be reachable from a Pickaxe on the same network.
- Have the device's Modbus register map from its manual: the index (address), unit ID, register type, data type and scaling for each value you want.
Step 1: Add the Device
- Go to Infrastructure and click Add Infrastructure.
- Enter a Name, choose the Type (for a site meter, Meter - Modbus Meter), select the Pickaxe, and enter the IP Address and Port.
Step 2: Add a Command for Each Value
Under Modbus Command Setup, click Add Command and choose what the command reads:
- Get Site Telemetry: your site's total power draw, for Metered Site Load.
- Get Available Power: the power available to you, for Buffered dispatches.
- Custom (Get Data): any other reading. Give it a Custom Label, such as "Gas Pressure", so you can pick it in dispatches and triggers.
Then fill in the register details:
| Field | What to enter |
|---|---|
| Index | The Modbus address of the value. |
| Unit Id | The Modbus unit ID of the device. |
| Variation | How to read it: Coil, Discrete Input, Input Register or Holding Register. |
| Register Count | How many registers make up the value. |
| Data Type | Integer, Float or Text. |
| Mask | Which bits to keep. For a whole single register use 0xFFFF; for two registers, 0xFFFFFFFF. |
| Shift | Bit shift to apply. Usually 0. |
| Multiplier | Scaling to convert the raw value into real units. Power values must end up in watts; for example, use 1000 if the meter reports kW. |
Click Save.
Step 3: Check the Readings
In the device's actions, choose View Current Stats. Readings can take a few minutes to appear. If a value looks wrong by a factor of 10 or 1000, adjust the Multiplier.
Step 4: Turn On Metered Site Load
For a site meter, the device's Use this device for metered site load switch has to be turned on before the Command Center shows Metered Site Load. If the switch is disabled, contact your Customer Success team to enable it.
Related Articles
- Quick Guide: Metered Site Load
- Quick Guide: Buffered Dispatches
- Quick Guide: Infrastructure Initiated Dispatches
- Quick Guide: Infrastructure
Last verified: November 23, 2026